Full Incident Summary


Penstock Incident Summary
Incident ID5
Incident Date04/17/1998
Penstock TypeRiveted Steel
Initiating Event 
Dam FailureNo
DescriptionFailure of the penstock. Four linear feet of the five foot diameter penstock was completely torn away (structural failure). Damage included erosion of side hill and embankment adjacent to the powerhouse, spill of lubricating oil, tipped over transformers, local power outage, flooding of the powerhouse about three to four feet with mud, and extensive damage to one of four generators.
Failure ModeRiveted steel penstock ruptured
EffectPenstock rupture caused erosion of fill and flooding of the powerhouse. This, in turn, caused a powerhouse shutdown, release of oil into the river and knocking out a local distribution line.
Storage LostFALSE
Fatalities0
Remedial ActionLicensee investigated cause of the rupture and replaced pipeline and penstocks from May 1999 to January 2000.
KeywordsPenstock; Structural Failure; Erosion; Oil Spill; Generator; Powerhouse
  

Need More Information on Penstock Incidents?

Click Here