Dam Name :
(partial name ok)
Dam Type : 
Country : 
Event Year : 
between:
and:
State Province : 
Modification/Repair Type : 
Structure or Component Type : 
Issue/Need : 
Normal Reservoir Storage (cu. m) : 
between:
and:
Dam Height (m) : 
between:
and:
Keywords : 
Modification Table for MORROW POINT
[ 1 2 3 4 5 6 7 8 9 10 ] Next : Last
Details found: 654
Page 1 of 33
Records Per Page: 
     Full Record Dam Name Dam Type Event Date Modification/
Repair Type
Issue/Need Total Cost
View Wanapum Dam 1/1/1962 Post-tension Anchor Overturning
View John Hollis Bankhead Lock and Dam (I) 1/1/1965 Post-tension Anchor Rehabilitation
View Morrow Point Dam 1/1/1967 Post-tension Anchor Wall Stabilization 15,400,000 USD
View Little Goose Lock and Dam 1/1/1968 Post-tension Anchor
View John Hollis Bankhead Lock and Dam (II) 1/1/1969 Post-tension Anchor Rehabilitation
View Rainbow Dam 1/1/1969 Post-tension Anchor Rehabilitation
View Ryan Dam 1/1/1970 Post-tension Anchor Dam Stability
View Libby Dam 1/1/1971 Post-tension Anchor Wall Stabilization
View Name 1/1/1972 Post-tension Anchor Global Dam Stability
View Pit No.7 Dam 1/1/1973 Post-tension Anchor
View Newburgh Dam 1/1/1973 Post-tension Anchor Dam Stability
View Hildebrand Dam 1/1/1974 Post-tension Anchor Flood damage repairs for scouring
View Pacoima Dam 1/1/1975 Post-tension Anchor Seismic Upgrade/Stability
View Lake Milton Dam (Phase I) 1/1/1975 Post-tension Anchor Stabilization of spillway also 483,000 USD
View Ocoee No. 1 Dam 1/1/1975 Post-tension Anchor Global Dam Stability 9,500,000 USD
View Alum Creek Lake Dam 1/1/1977 Post-tension Anchor Dam Stability 254,777 USD
View Conowingo Dam 1/1/1978 Post-tension Anchor Increased Design Floods 4,600,000 USD
View JAMIE L WHITTEN LOCK AND DAM 1/1/1978 Post-tension Anchor
View Wanapum Dam 1/1/1978 Post-tension Anchor Wall Stabilization
View La Prele Dam 1/1/1978 Post-tension Anchor Pinning the dam to rock foundation
[ 1 2 3 4 5 6 7 8 9 10 ] Next : Last
Details found: 654
Page 1 of 33
Records Per Page: