Event Table for Pit No. 5 Diversion
[ 1 2 3 4 5 6 7 8 9 10 ] Next : Last
Records found: 5610
Page 1 of 281
Records Per Page: 
 
Dam Name Event Date Event Type Event Description
GERDING LAKE DAM Construction The dam was constructed. The date is not known.
STOUT LAKE DAM Construction Construction of the dam was completed. The date is not known.
Openaka Lake Dam 1/1/1700 Construction The dam was reportedly constructed in the mid 1700's. Those responsible for the construction of the dam are unknown.
MASHAPAUG POND DAM 3 1/1/1740 Construction The dam and dike were originally constructed in 1740 for the generation of mechanical power for downstream mills.
MASHAPAUG POND DAM 2 1/1/1740 Construction The dam and dike were originally constructed in 1740 for the generation of mechanical power for downstream mills.
MIDDLE RESERVOIR 1/1/1800 Construction The Middle Reservoir Dam was probably constructed in the late 1800s. The original dam was constructed only of grouted stone masonry.
SOUTH POND 1/1/1803 Construction The dam was reported to have been built in 1803.
Union Lake Dam 1/1/1838 Construction The dam is belived to be one of the oldest earth structures constructed in New Jersey, variously reported to hve been built as early as 1838 and as late as the 1870's. Historical reports indicate that it was built with horsecarts using excavated material borrowed from an area upstream of the right abutment.
NORTH POND 1/1/1840 Construction The dam was built in 1840 by the American Brass Company.
BLADENS RIVER DAM 1/1/1845 Construction The original masonry portion of the dam was believed to be built in 1845.
Mill Dam 1/1/1845 Construction The dam was reportedly constructed in 1845 to impound a water supply source for Mount Holly Township.
Dundee Dam 1/1/1854 Construction The dam was constructed in 1854. No further information was available.
BOLTON LAKE 1/1/1856 Construction The original dam was built by Bolton Reservoir and Water Power Company of Andover, CT around 1856.
WILLIAMS POND DAM 1/1/1865 Construction The dam was constructed about 1865 by the Kent Manufacturing Company.
COLUMBIA LAKE 1/1/1865 Construction The dam was constructed in 1865 by the Willimantic Linen Company of Willimantic, CT for use as a back-up source of water power.
SAWMILL POND DAM 1/1/1870 Construction The dam was reportedly built around 1870.
CASE BROS. POND (UPPER) 1/1/1870 Construction The dam was originally built about 1870.
Breakneck Dam 1/1/1870 Construction Reportedly the original embankment amd spillway were constructed around 1870. The earthfill embankmnet and the brick arch culvert basically have remained unchanged since the original construction. The spillway was originally a timber frame structure with timber stoplogs.
FITCHVILLE POND 1/1/1871 Construction The dam was constructed around 1871. It was originally a masonry-timber structure with earth embankments.
Westfield Reservoir Dam 1/1/1874 Construction The dam was constructed in 1874.
[ 1 2 3 4 5 6 7 8 9 10 ] Next : Last
Records found: 5610
Page 1 of 281
Records Per Page: